How can get electrical c licence.Now i am working in spining
Mill , transformer capacity 2750kva. Sanction demand 2250kva.
Please advise me . My contact no 09944226823
Answer Posted / jack
yes Rama Rao, actually i am going to hear that a sum of rupees 200000 have to pay when it will be. please suggest me
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
give me atleast four differences between circuit and network
What is the dependency of stiffness on load angle??
How to calculate that clean water supply in one Day from 150 KLD STP?
can the measured percentage error during calibration of single phase energy meter be negative?
define the active power?
The height to which the liquid in a tank to be maintained for a certain constant velocity?
HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?
What type of pipe material G.I or M.S is used for sprinkler system?
What is electrical diversity factor in electrical installations?
What are the difference between normal application Transformer and Solar application Transformer?
Can i use the B-curve MCB instead of C-curve MCB
Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?
How are load losses and no-load losses measured at site in a DG set?
Define peak time.
we have consol make 3 phase servo stabilizer for cnc m/c. while installing the earth neutral voltage is 1.7 volts at stbilizer off condition and when stabilizer get on en voltage reaches 4.8 volts (new earthing is done and neutral is helthy condition all phase to neutral volts 440,442,441 v)why this happen.solution for cause.