Answer Posted / amit kumar
m25 means grade of concrete.whose compressive strength after 28 days with deviation 0.825*4+25=28.3 kn/sq.mm. but not less than 25 kn/sq.mm
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
what is the construction cost for per cft of multistorryed building in kolkata?
Explain moment of inertia?
how to caluclate sienerge qty in construction in ap
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Trapezoidal section footing calculation of Volume & its Area
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what is idealized curve for concrere and steel
five requirements of infill panels for walls?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
i need gate exam civil engineering question papers with answers
What is the diff between cad & cadd?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What is dead load impact load live load
Please tell me vasthu room sizes. Thanks.