Answer Posted / amit kumar
m25 means grade of concrete.whose compressive strength after 28 days with deviation 0.825*4+25=28.3 kn/sq.mm. but not less than 25 kn/sq.mm
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is pouring and explain
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
what are the values of compressieve strenght?
What is an ice dam sock?
What is the difference between EPC,DBOOT and BOOT.
what is the basic difference between Coloumn & Shear Wall
What is meant by scaffolding coefficient?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
How do you calculate the power of centrifugal pump?
Which IS Code/American Code applied for coupler test of steel
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like