Answer Posted / sachin parmar
water bound mecedm
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to check and keep control on the wastage of material at site
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
what is smart building materials?
how do you stabilize a waterlogged area in road construction
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
types of piles detail,
How to cal. The weight of hollow pipe?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
what is the water cement ratio for plastering
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
How to find the cuplock pipe qty in staging for Minor bridge?
Which purpose we use deck anchor in bridges?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What is the Roll of Water Bonding under VDF road?
what is escalation?how it is done?