how to calculate shuttering measurement of beam and slab
Answer Posted / senthil473
sorry, sum also the, total depth of the beam (no. 2 and 4 which are parallel to each other) * the clear span of the slab which is parallel to the no. 2 and 4 beams with the above formula.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Material calculation of cm 1:6 for 1sqm
How to calculate chejja reinforcement
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
What will be weight of 0.5mm GI sheet per sq.ft?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
how to determine H- zone in a column? where it will occur?
How many types bend used in civil reinforcing
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
What is the sugested procedure of water purification for public supply?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
What is hybrid foundation?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What materials were used to build the golden gate bridge?
Write short note on construction programme for pile foundation.