How and where from do we get 162 for calculating sectional weight of TMT
Answer Posted / hidayathulla
Area = (Pi D2 /4)
Density of Steel=7850 kg/ cub meter
Weight = Volume x Density
Derivation:
Area of bar x length of bar x Density of Steel per cum
= (3.14 x D2/4) x 1000mm x 7850 kg/m3
= (3.14 x D2/4) x 1000mm x (7850 / (1000 x 1000 x 1000)
= D2x0.785x1000x0.00000785
= D2X 785.714 x 0.00000785
= D2 X 0.006162
= D2 X 0.006162 = kgs/1000mm
= DxD / (1/0.006162)
= DxD/162.19
Watch here for detail: https://www.youtube.com/watch?v=29k9H84etUQ
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
How much time Required for PPR pipe network testing
how we calculate the vol.of wet concrete..?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
Form where IS456 is adopted in 1978?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
What is horizon or horizontal mining?
what is BPM in concrete demolition hammers. what is better a higher value or lower
Explain what is the difference between built area and super built up area?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
What is specific gravity???