Answer Posted / dharambir sobha
P=plane
C=cement
C=concrete
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
how to do sudoko puzaals?
What is the difference between 53 grade and 43 grade cement
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
how to design and calculate materail quantity for concrete speedbreaker ?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
how gradation of aggregates effect on slump of fresh concrete?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
is basic cost of the material includes tax?
What is the procedure of concealed plumbing in toilets?
What is proportion of PCC Grade G?
Please let me know what is the simplest way of Calculating Mix Designs
For the construction project what capital cost has to be taken in consideration?
length where bent up is made in slab of bridge from one end