consumption of cement in p.c.c.
a. mix. 1:1:2
b. mix. 1:1.5:3
c. mix. 1:2:4
d. mix. 1:3:6
e. mix. 1:4:8
Answer Posted / b.aswinkumar
1:4:8
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate the quantity of ingredients of M20 grade concrete?
Advantage of Aluminum form work in terms of activities can be skip and cost too
Is it possible to make a feature using an overdefined sketch?
How did street originate in the plumbing term street ell?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
why demand factor less then 1 ?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What is the per cu. mt. price of ready mix in Gujarat region.?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
How to calculate material and labor required for 100 m2 plaster?
what are the ffactors you considered choosing the course?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?