I am opertaing generators which are beyond 14000hrs and now the fuel consumption is about 2kw per liter of diesel. The engines are due for overhauling. is this normal
Answer Posted / r.k.
If you want diesel consumption constant then your rpm will reduce result of it your generator will be overloaded so conclusions of that is change regulator section of greater efficiency and rating otherwise if you modify your engineers regulator then change Senegal diode of higher PIV and current rating and also change voltage Divider circuit
Isse ye hoga ki yr altinator ka rotor ki winding me current jyyada Jane lagega or rotor field stronge hoga
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why do you consider yourself a suitable candidate for this position
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
what is restricted earth fault explain in details
procedure of how to generate power in solar plant.
How do you consider that you can improve and what assistance do you need to achieve this
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
what is the difference between compensated & normal drum level in boiler drum?
what does mean by kva rating
can dp type level transmitter work in under vaccum condition
what's the moog valve
By any way can we increase the B check hours from 300 to 500
what is the trip circuit supervision in an electrical meaning?
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525