What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
Answer Posted / jsm1919
M10-1:4:6. M15-1:2:4. M20-1:1.5:3. M25-1:1:2
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
very simple or less time consuming formula for reinforcement calculation by moment
how we can find sieve #4 is 4.75mm?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
How to construct a water sump in a rocky soil?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
What are the different softwares used for cad?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
which steel is better for residential building tmt steel or hysd steel
how to prepare site mix design
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?