What is the result of cube in 7 days test ?
Answer Posted / suman
66.67%
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
why do we not deduct volume of steel to find actual volume of concrete in practical???
What is the zero value in quantity surveying
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
What is Time period of a building and its relation with frequency ?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
What out turn civil works
what is the procedure of wet seiving. n percentage of silt in different type of soil?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
PL.tell me about civil engineering questions with answer
List out some of the checking’s, done at the completion of construction?
What are the different theories of failure under static load?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
For a washout valve why are two gate valves required in normal practice?