Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / ashok kumar chaudhary
Dear Sir,
SOLUTION :-
=((LxBxd)+(LxBxD/2))M3
Here L=2.0M
B=1.7M
d=0.15M
D=0.50M
((2.0x1.7x0.15)+(2.0x1.7x(0.50-0.15)/2))
=((0.51)+(3.4x(0.35/2))
=((0.51)+(0.595))
=1.105 M3 Ans.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is .Dwg?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
3. What are the disadvantages of your present job, things you do not like about it?
why building got air crack? if it get in one particular are what is means?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is the clear cover for shearwall?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Why do you want to work here
What is the average density of soil?
Explain the latest method to detect a crack in a building?
Advantage of Aluminum form work in terms of activities can be skip and cost too
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.