Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate concrete pouring of foundation

Answer Posted / ashok kumar chaudhary

Dear Sir,

Calculate of Concrete Quantity of a Foundation

Length of Foundation = L (Mtrs)
Width of Foundation = B (Mtrs)
Height of Foundation = H (Mtrs)

So,

Volume of Foundation(Cubic Mtrs)=QuantityofConrete(Mtrs)

Length(Mtrs) X Width(Mtrs) X Height(Mtrs) = Volume(Mtrs)

L(M) x B(M) x H(M) = V(M3)

Conrete Quantity = V (M3)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1705


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2482


as per is code, what is the minimum content of opc and ppc cement for rcc structure

2280


what is anchorage length,lap length and (dont remember the last one)

2218


What is the difference between 53 grade and 43 grade cement

1739


Explain major difference between auto level and dumpy level?

1205


what is the formula for Mass of cement grout (Dg)=???

2219


What is demising walls?

1175


What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

2033


Which is the best book for building construction?

1110


5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

9186


Minimum concrete cover in slabs, columns, beams, foundation and other st?

1285


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2571


what is the types of door's wood?

2096


why is M30 grade Concrete use for Foothing & Column M50

3498