Answer Posted / parvez
IS 2502
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
how statics is different from dynamics
What is difference between code and standard and specification?
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
Explain the advantages and disadvantages of using plastic and timber fenders?
Why the statue of liberty is made of copper?
What is the distance between railway tracks?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
The portion of a brick cut across the width is called?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
how to caliculate required amount of cement and sand required for 1cu.m.
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
what is anchorage length,lap length and (dont remember the last one)