Answer Posted / lifeishonest
Drawing is heart of civil engineering
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
as per is code, what is the minimum content of opc and ppc cement for rcc structure
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
Explain major differences between routing maintenance and major maintenance.
Explain what is 1/8 on the architect ruler denotes?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
What is the difference between one-way slab and two-way slab?
What should be the standard roof height like to be?
what is the maximum number of course that can be laid according to IS code and the max height.
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
what is the Asfalt test?in road constraction..?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?