Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 cum of 60*25*25 block cost 187 dirhams. Find the cost of 1 sqm of block ?

Answer Posted / sidhartha

It cost 1 dirhams.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

2089


does a b.tech civil engineer fresher supposed to know how to design rcc structure?

3394


what is a well

1920


what is called Bulk Density of aggregate?

1818


What is difference between combin footing & rapt footing

1789


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2522


How to calculate plastering for elevated water storage tank

1225


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

2051


What is the difference between built area and super built up area?

1160


what is tension & compression of steel bending.

2261


How to find out kg per Sft ?

2239


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2394


how to take concrete quantity for precast segment for viaduct project?

3049


How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1913


how to identify np3 pipe and np4 pipe

1987