Answer Posted / umesh mahato
-It would be a great privilege for anyone to work in a reputed company like yours. Being a fresher, I think it would provide me an excellent platform to build my carrier and to learn as many things as possible.
-I like to work on the platform that makes the work innovative and creative. I believe that this company provides me the best.
-I am searching a good opportunity where I can see myself in a better position. I think this is the one where I can use and encourage my knowledge, talent and skill.
- I think that this company gave me a good opportunity to explore my knowledge and enhance my skill to help the growth of a company and my career.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
how we calculate the grade of the Bituminous materials.?????
The 4 main factors to start a construction project are––
what do you know that m20,m25
How much cum. Brick work can do by 1 madon
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
What is the difference between Grade I, II and III of GSB?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What is the per cu. mt. price of ready mix in Gujarat region.?
how many litres of enamel paint required for 5000 sft of site??
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
pls tell me , what is the water content
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is constat for brickwork
what is called Bulk Density of aggregate?