Answer Posted / shahnawaj alam
Skilled labour, non skilled labour dependent upon the civil engineer as well as construction field, a civil engineer comes in the field first after or with him/her remaining formation is done, civil engineering have link in everywhere so I choose CE and proud on CE that I m a CE.....but all the things is not 100% so "ALL IS WELL"
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Why should pumping be not used in case of concreting work?
Spider cracks occur in beam bottom due to––
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
What is the absolute pressure scale?
will fix foundation bolts at site with out template is there any procedure?
important question on stones
What is the difference between engineering stress and true stress?
In earth work 1300 cum soil how to calculate how many liters require in water
Define What is diversion tunnel in a dam?
What is the density of most of construction materials?
how to calculate spacing rod in column
what is the weight of 6000 psi concrete in lb/cft?
What are the responsibilities of a site manager?
What is meant by cartesian coordinate system?