what is the main difference between simplex RTD and Duplex RTD?

Answer Posted / swapnil

main basic difference is simplex and duplex RTD is two point in duplux rtd if one point is damage in rtd then use in other point . so simple procedure and lower cost.

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Work done in a free expansion process is

696


how to control the speed to switched reluctance motor

1479


electrical knowelge

728


Draw transformer phasor diagram.(full load,no load)

3685


explanation of mesh bus bars

1670






As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

1183


in my industry we are using 3 step up transformers for induction heaters..i.e 415/580v and other are 11/440v.in power consumption does a step trnsformer makes any difference compared to step up?? plz explain

1423


1.4 What is meant by CT knee point voltage and how would you determine it

1146


what do you mean by type zero control sytem ?Give an practical example of type zero contol sytem?

1539


If not into production, how far did you follow the design and why did not you see it into production?

1704


why incomer bay is required before transformer bay if there are more than 1 nos. of transformer bay.

2607


Define average demand?

894


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1549


what is doid

2291


What is meant by full pitched winding?

627