As per the Process:
1.Bearing Piles
2.Friction Piles,
3.Sheet Piles
4.Displacement piles
As per the Material
1.Wooden Piles
2.Cast in Situ Piles
3.Pre Cast Piles
4.Steel Piles
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is binding spacing of the rebars at lapping zones.
Aptitude, reasoning, quants, verbal and technical question
Name the main components of a cad gui?
how calucate cement sand ratio for plstering
crank types
States some of the commonly used commands in cad software’s?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
What is meant by dimensioning?
What are the uses of layer?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
plz.show development and anchorage length in simple diagram.
Why you are leaving present job?