Answer Posted / nawan
As per the Process:
1.Bearing Piles
2.Friction Piles,
3.Sheet Piles
4.Displacement piles
As per the Material
1.Wooden Piles
2.Cast in Situ Piles
3.Pre Cast Piles
4.Steel Piles
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How many square meter can mason layout chb per hour
why does the most of civil engg is not intersted to going for teaching field?
Sir how to find cutting length for footing steel bars in the shape of "u"
The portion of a brick cut across the width is called?
How does a traffic light signal work ?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
What was asked in isro civil interview
What is meant by dimensioning?
How much cement will require for 1Rmt Skirting laying
explain five benefits of using standard terminology in the measurement process?
Explain what is change order request?
what is called the inverd level of mabhole chamber?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What do you mean by bond? What are the different types of bonds?