Why we test compressive strength after 28 days..?
Answer Posted / amr
The strength of a mix is described by its strength after 28 days from casting. if a concrete of M50; the compresive strength 50 unit achieve only after 28 days from casting
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is E
what is w/c ratio in dry lean concrete for m10 mix design
What is Critical path in Ms-Project ?
Define What is the tallest man made structure in the world?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
I need to constructive work in amaraj batteries
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Would you cause a 55-gallon drum of water to weigh more by climbing in?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
What is the difference between shear and tensile strength?
What are your future hopes for this job?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.