Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is mean by bulking of sand?

Answer Posted / ranjith kumar

newly get sand volume (wet condition) its get to measure after 1 month volume will be reduce.because its ratio between wet sand volume and dry sand volume

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1674


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

1096


what is relation between SPT N value and driving piles after conducting a soil test?

2173


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1625


What is portland cement

8089


Why reinforcement done in shorter span in two way slabs

1801


significance of specific surface area of particles?

2255


if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

1906


What is hybrid foundation?

1115


What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?

3337


Why the finite element method is lower bound solution?

2963


how do we design mix ratio?

1851


Volume of 25kg putty bag & 40 kg putty bag volume??

2052


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2121


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

2086