Answer Posted / rashid
Raft foundation k
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the responsibilities of a construction manager?
What is the difference between 53 grade and 43 grade cement
What is the exception critarea of cube?
what is flexible and rigid footing?
why the profile of shell of natural draught cooling tower is hyperabolic.
What is the biggest dam in america?
All aptitude question of Bechtel
What are segregation and bleeding?
Explain the latest method to detect a crack in a building?
Describe the role of independent Quantity surveyor?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
what is column foundation
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
How many feet are in 4 square yards?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?