Answer Posted / tgraju
7.5 10 ppm
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is meant by engineering drawing?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
what is the water-cement ratio of mix design while 30mpa in 7 days?
How to come 1.54 from dry to wet concrete?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
how much shouid be the rate for ready mix concrete per cubic meter
significance of specific surface area of particles?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
why & what is perchatage we are using fly ash in concrete?
What you understand by building codes?
Any strength is a stress but any stress is not strength
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed