Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is themeaning of TBM in civil construction

Answer Posted / ibrahim

meaning of TBM is Temporary Bench Mark and also another Meaning of TBM is Tunnel Boring Machine
ex:- TBM = 100m It's mean Temporary Bench Mark
TBM Site Engineer or like this meaning Tunnel Boring Machine Site Engineer

Is This Answer Correct ?    17 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

The largest size of paper used in plotter to print the drawing made by Autocad .

1859


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2130


Which are the top apps for you civil engineer?

1217


A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

2168


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2770


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1951


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1730


will fix foundation bolts at site with out template is there any procedure?

2628


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1591


What are the Types Of DPC and its Thickness used?

1432


What is bmc stands for in bmc software?

1167


can i get civil engineering test papers.......?????

2453


What are the methods of measurement? Describe it shortly

2244


what is total volume of ingredients used in concrete accordingly

2231


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

1964