Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is DCS and PLC scanning time?

Answer Posted / abu maryam

scanning time:
In general: scanning time: it is the time taken to read all inputs then execute the program and apply on outputs.
In PLC: it is only 1 processor check the previous procedures so its scan time depend on the quantity of data and program.
In DCS: There are several processors each processor has its inputs and outputs and its private program so each processor in DCS has its private scan time applied on each loop.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

selection of the zener barrier for the hazardeous area zone 0

2310


anybody having Qatar Petroleum questions for instrument Technician offshore ....please send me

6092


describe flow nozzel principle?

2573


-/5A. What is the meaning and limitations of this in energy meter constant. It is a 3 phase LT Energy Meter. If this Energy Meter is connected through a CT of ratio 200/5 Amps, then what is the multiplying constant and how its will be calculated.

2542


hi my name is rakesh patel i just complited my be in instrumentation & control now i am going to working as a validation engineer in a poject department so what is a scope in a future as a validation engginer ? what line is good for me can any bady give me complete solution please? your regard rakesh patel

2016


What is offset in a control system.

9121


Can any one send me IOCL instrumentation question papers.. i dont know the pattern of the questions and what to prepare can any one help me on this .. my email id is anwarnishil@gmail.com

2304


tell me the field & lab calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter, temperature transmitter, temperature indicator, flow indicator, level indicator, control valve, thermocouple, pressure indicator (digital & analogue),

2376


What materials are used in thermo wells?

1229


what is performance test.need defination

1766


What are different types of orifice plates?

1269


How oil line flow measured?eplain about instruments used and working principle?

2102


what is different between 2,3&4 wire rtd and how much maximum distance using plc to field.

2832


How to calibrate H2s Dectector

1677


How to erection of DCS Panel at site step by step

1545