Answer Posted / ranjith
In Mahesh's answer, it says 'Nodes are I/O communication protocols' this part is wrong.
In a typical DCS architecture from top you have got,
0. MES/SAP/
1. Operator station
2. Runtime/Database/Historian/Batch/Gateway & Engineering Servers
3. Controller
4. IO nodes
5. Marshalling Panel
6. ...(I'll stop here)
The IOs are generally not clustered with the Controllers, IOs will be in a different panel communicating with the controller in various communication protocols(exceptions are there).
There will be a slave module communicating to the master(Controller) and also communicating to the IOs connected to its Backplane/Bus of the slave. This slave module and the IOs are collectively called as 'Node'.
There will be multiple nodes due to segregation of IOs(Plant/unit/Process part) or to distribute the slave module's load (different manufacturer has different IO density specified or may be limitation of protocol).
Now imagine wiring the whole bunch of field signal cables to your control room...!
An alternative is to take a communication cable from 'Main control Room/Center' to 'Remote/Sub station' may be kilometers apart and enjoy limited wiring.
Total number of nodes are limited by the communication protocols itself. (Payload, Noise, Cycle Time ...)
Further reading:
Industrial Communication Protocols /Fieldbus
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
How to convert Differential pressure to flow in TPH
what is exact time to study dcs and plc cources
How INtools is useful for routine Instrument maintenance?
What is standard of DCS panel design?and what is step of DCS panel design?wiring and type of connector(screw or DB connector)
Decibel.
why use 50% lel methane gas concentration for gas detector calibration instead of 60% lel gas concentration whereas the hi alarm set at 60% lel.
A flange is used for instrument connection for a system with a design temperature of 316C (600F) and a design pressure of 1000 kPa (145 psi). What is the class rating of the flange to be used for this application? Explain your answer
What is PDS and PDMS ?
What is the reason PT speed not incresed in gas turbine?
Can combine control system for Emergency control system (ESD)and Fire & Gas System ( F & G) is possble to built and offer to client? Can such system is as per Norms in India?
how the arrangement of equipments done in control room
Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =
Explain the key components of control loop?
Question on maha cement
hi my name is rakesh patel i just complited my be in instrumentation & control now i am going to working as a validation engineer in a poject department so what is a scope in a future as a validation engginer ? what line is good for me can any bady give me complete solution please? your regard rakesh patel