Answer Posted / adil abbasi
In structural engineering, a pre-engineered building (PEB) is designed by a PEB supplier or PEB manufacturer, to be fabricated using best suited inventory of raw materials available from all sources and manufacturing methods that can efficiently satisfy a wide range of structural and aesthetic design requirements.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
calculate the quantity of water for 1:6 cement mortar
how to do cementicious paint for rcc walls of cw pump house
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
what is modular brick and it size
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
sir how can we find the cement and sand required for making 4" drop
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in