how to calculate no. of bricks for 1 cft?
how to calculate cement and sand in cft?
Answer Posted / nadim shaikh
iam truly sorry i forgot to add dry volume 50% into 33% of wet volume of that desired brickwork
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Ratio for 4500 psi concrete
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
What is braced excavation all about?
at what pressure ply-wood is obtained by gluing wooden sheets
how to take concrete quantity for precast segment for viaduct project?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Explain the different types of roofing systems?
crank types
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
what is w/c ratio in dry lean concrete for m10 mix design
can i get hindi version of is codes based on civil engineering?