how to calculate no. of bricks for 1 cft?
how to calculate cement and sand in cft?
Answer Posted / nadim shaikh
iam truly sorry i forgot to add dry volume 50% into 33% of wet volume of that desired brickwork
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Draw the cross section of a boundary wall and label its part with detailing?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
what is E
what course did you consider thinking before you enrolled in college?
1m square 20mm plastering how much of water need curing work
What is the basic difference between OPC
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
how meny typs of renging rod?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
how to estimate material requirement for an area of house in square feet?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
What is change order request?
what is differences between ferrock and concrete ?