calculate length of column or beam . check distance into strips . for exp: column or beam length is 10 meter and strip distance is c/c 200 mm so now divide 10 M /200mm
ans is 50 its means 50 no. of strip .
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How do you compute volume of airflow?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
How many pyramid in egypt?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
What are the applications of cad?
Explain what are the skills required to become an architect?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
how to calculate load bearing column
What is the largest concrete dam in the world?