Deshuttering time for slab 6.15 meter

Answer Posted / atul priyadarshi

21 days after casting.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1392


why do we provide haunches in rcc box or underpasses?

2467


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

1887


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

2007


How do you calculate the unit weight of concrete?

671






pls mail some more tecnical qustions at msaranya2610@gmail.com

1691


How to find beam R/F cutting length

1224


Define What is the distance between railway tracks?

674


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

3780


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2017


what is the name of shuttering oil used in oman

2248


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1099


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2227


how to calculate total cost for slab 35'×8'

1504


types of piles detail,

1810