Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to cement bag calculate m25 grade

Answer Posted / z.m mughal

M25 = 1:1:2

10.87 bag/m3

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why do we provide haunches in rcc box or underpasses?

2988


is concealed wiring a problem in fly ash brick wall?

2518


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

2296


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

2041


How much percentage of brick bats allowed in CD-75 bricks

2305


density of crush sand & crush stone or grit powder

6785


what do you know that m20,m25

1882


What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

1825


Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.

2501


What expenses counted in contingencies and how much it is in related to built-up area of the building.

1760


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2442


we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?

2330


How do we calculate the power of centrifugal pump?

1159


States some of the commonly used commands in cad software’s?

1197


in the construction of residential building what type of tank are used?where?why & what is its purpose?

2371