What is value of S.F at Point of contaflexure?

Answer Posted / praveen

pont of contaflexure means -where the bendingmoment changes from positive to negative or negative to positive its sign .....so then shear is 0.

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the maximum strength of cub compress strength in one cub testing

1379


what is the percentage of silt in black cotton soil.?

1951


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1671


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2335


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

1565






cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?

1882


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2609


sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

1488


What is the significance of cost estimate knowledge for an architect?

1145


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

1582


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

659


What is meant by cad?

649


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

1689


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1504


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2134