i Have Completed a Intermediate Vocational (Construction
technology) with Bridge course ,iam elegible to join in
Institute of Surveyors(india).
Answer Posted / p. suresh babu
1-9-67, near alwal police station, temple alwal secundeared:-500010
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is rate of concrete surface rendering work per sqm
what is the use of water bar in water tank and is this an extra item in estimate?
how can we calculate steel value, depending on load
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
Which Types Of Bricks ?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
How to do rate analysis for concrete work including shuttering work?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
why +1 to be followed for calculating the no of bars in BBS. Please explain
If specific gravity of cement is less than 3.15 what is the cause?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
What is progress payment?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
Cement consumption of one cubic meter of aerocon blocks masonry?