what is zero sequence curr
ent ?

Answer Posted / shankari

there is no sequence at all.they are all in phase with each other

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to select rating of HT Panel

922


what are the advantage and dis-advantage of 3 phase 4 wire energy meter?

1458


Where is servomechanism used?

660


how to decide the capacity of accl

1907


can u give me a brief idea about power line carrier communication ??

1389






why do we use spark detector inside the slip ring brush compartment 0ona slip ring induction motor?

1627


WHAT HAPPENED DC SERIES MOTOR FIELD WINDING OPEN. CAN POSSIBLE.

3199


While HT line put on to activate ACB in low tention panel VCB tripping instantly.why it happens

1584


1.dg on load alarm/stop alarm... 2.dg on load. piu alarm alarm kaise chek krte hai

1382


I just purchased a 4 position cam switch to be used to operate a 3-speed blower motor. The motor is a 10 amp motor and has 3 wires that are used to control speed. The cam switch was rated at 660V 20 amps but when I received it, I noticed that it has AC-15 operational current rating (Ie) of 4/5 amps. If I am reading the label correctly. the 4/5 amps is related to 440v/220V (Ue). Other ratings are AC-3: 5.5A, AC2: 7.5A and AC-4: 1.5A. My questions are 1) Is it safe to use this switch with the motor I have 2) what is the difference between the 20 amp Ith ratting and the Ie operational ratings?

1215


what are the main applications of transistor in non-linear region?

1442


How to decide the size of the capacitor for a single phase induction motor say 2 HP ??

1640


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1485


How to calculate per unit impedance of transformer?

1562


What is Scheme Test of High Voltage Switchgear. Which tests it includes.

1893