Calculating Seawater consumption for SWFGD system
Answer Posted / turng
Sorry, I'm not good at english
I have reaction to desufurization:
SO2 + HCO3(-) +1/2O2 =SO4(2-) + H(+) +Co2
HCO3(-) in seawater is 140mg/L
So, if we have mol of SO2 and stochiometric ratio of that reation, we can calculate HCO3(-), then we have seawater consumption, right?
And.what is the stochiometric ratio of that reaction ?
Thank you!
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
What is LB-SR.
can dp type level transmitter work in under vaccum condition
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
LAPT working in alternator / generator
operation
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
what is restricted earth fault explain in details
what is the difference between compensated & normal drum level in boiler drum?
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
what's the moog valve
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
why do you consider yourself a suitable candidate for this position
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon