Answer Posted / er. vaseem ahamad
Dry bulk density
It is s tedt of soil engineering.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what are the code used for residental building?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
What you understand by building codes?
Define a polyline?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
Define What is diversion tunnel in a dam?
whou haat goals do you have in your career
how much cement and sand required for 1cum rr masonry
Detection of a beam & a girder areββββ
How much cement,sand,bricks and water needed for 1square metre brick work?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
what is tension column?
how to calculate MR 9(derivation)