For any grade of PCC
1 Cum. wet concrete needs = 1.52 Cum. dry ingredients.
Cement = 168.34Kg / 3.367 Bags
Fine Aggregate = 0.467 Cum. / 16.52 Cft.
Coarse Aggregate = .935 Cum. / 33.34 Cft.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what is education Cess.
can you provide a link for manual design of building?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
density of crush sand & crush stone or grit powder
how to conversation of all construction material in to brass
How is calculate the cube molt
Why should appointment store person for project ? what is the benefits for company ?
What is difference between combin footing & rapt footing
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
What does a construction cost covers and what does not?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
How to find out kg per Sft ?
what course did you consider thinking before you enrolled in college?