suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

2302


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1349


How to calculate the load of partion in flat slab if we use brick?

1385


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

1518


what is the service corridor?

1909






how lap length is increased with increase of Grade of steel?

25250


How many square meter can a worker/labor demolish a structure per day?

1518


how to conversation of all construction material in to brass

4695


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1583


Explain the importance of moment of inertia?

759


i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need

2059


Formula for calculation volume of essentric footing

1265


In cement concrete how to check a quality of material also proportion of material at site ?

1429


show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water

1623


what is the coefficient for running feet to cft coversion both area and price

1925