Answer Posted / manzoor hussain
international system
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
How to calculate the load of partion in flat slab if we use brick?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
what is the service corridor?
how lap length is increased with increase of Grade of steel?
How many square meter can a worker/labor demolish a structure per day?
how to conversation of all construction material in to brass
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Explain the importance of moment of inertia?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
Formula for calculation volume of essentric footing
In cement concrete how to check a quality of material also proportion of material at site ?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what is the coefficient for running feet to cft coversion both area and price