Our transformer capacity is 500kva & voltage ratio is 11kv/433v step down tf.Now i need to know if my input voltage is 10500v and what would be the secondary side voltage i.e output voltage ?
Answer Posted / mahmoud khaled
secondary out = 10500*(433/11000)=413.3 volt
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
what's the requirement of Dy11d0 connection of 3 phase transformer?what's use of it?
how to find motors H.P. whout any rating? (only give you a motor and multimeter)
What are the differences between single phase and three phase?
1.what is difference in maintain Hz again Hz in USA ? 2.how to calculate the battery AH? 3.why are yearly maintained in transformer how many tests in required?
how to interlock 3 incomer-ACB,1 buscoupler ACB,... pls answer this question and if possible send me the ckt diagram..haifriends2910@gmail.com
What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?
A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.
A well system is when , no. of bus bar is less or more. Tell me the concept of it.
What is excitation in case of dc motor?
What is main cause of cable's terminal point burned in Lug on high temperature although lug and cable selection is ok as per stantard and also tightness is ok as per situation. so please take in deep and tell correct answer thanku.
how to select energy meter? have any calculation?
how to electrically make connection to ferroli GN2N?
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
I Need standard operation procedure(SOP)for 500kva Oil type transformer oil filtration & Procedure for IR value checking.
WHAT IS DIFFERENCE BETWEEN CAPACITOR AND CAPACITANCE?