What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..

Answer Posted / hari

Factor consider 30% for 1Cum
= 0.30

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which tests are performed on soil to decide the type of foundation to be provided.

1629


Define What is passive earth pressure ?

685


How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density

1537


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1267


What things you need to take care of before building a kitchen island?

717






Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

1621


.5Ast

1335


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

1799


Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

874


How is make concrete cube?

690


How to do rate analysis for concrete work including shuttering work?

1545


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1398


what is labour consume factor in residential projects

1844


How to determine spacing of bars in slabs or beams

1965


Gidc technical que paper

1250