In Fe415 & Fe500,What is mean by "Fe" and "415/500"?
Answer Posted / jagannath nath
Fe 415 & Fe 500 is yield strengths of deformed bar 415n/mm2 & 500n/mm2
Which is applied minimum strength of iron 415n & 500n force per mm area.
Is This Answer Correct ? | 17 Yes | 1 No |
Post New Answer View All Answers
construction workers how much time take one work or qty
what is the method used for marking of cantilevers in hirise buildings by using theodolite
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
how much one carpenter can doing shuttering of slab in one day
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
How can explode a block?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
How much cum. Brick work can do by 1 madon
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.