Answer Posted / sai ganneshh
sand=0.20cum(1cum*0.20=0.20cum)
1 cum cement= 0.20*1440/ratio last digit
if(1:5) cement =0.20*1440/5=57.6kgs
1 bag =50kg
(57.7/50=1.154bags)
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
How do you compute the volume of airflow?
what post do you prefer to work in this company and why do you think you can serve better in such position?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Which is stronger solid steel rod or hollow steel pipe?
What are the different types of foundation?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
which type of instrument included in plumbing work?name of instrument?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
what is right & short method of measurement of slab&beam
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.