Answer Posted / j c gogoi
In india maximum permissible loads (sbc) shall not exceeds 3 mpa. Further, rqd and joint spacing has a vital role in s b c estimation. A lone piece of rock may sometime shows higher ucs which may lead to misunderstanding of behaviors. In addition to this, our indian codes suggested to consider soft and jointed rock mass as soil deposit. In the stated case of sand-stone, in my opinion, it is better to adopt a sbc of maximum 50 tonnes/sq m.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
Explain soil analysis?
Explain what is Critical Path Method (C.P.M)?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
What is difference between combin footing & rapt footing
is basic cost of the material includes tax?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
what is right & short method of measurement of slab&beam
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Describe a time when you anticipated potential problems and developed Preventive measures