Answer Posted / j c gogoi
In india maximum permissible loads (sbc) shall not exceeds 3 mpa. Further, rqd and joint spacing has a vital role in s b c estimation. A lone piece of rock may sometime shows higher ucs which may lead to misunderstanding of behaviors. In addition to this, our indian codes suggested to consider soft and jointed rock mass as soil deposit. In the stated case of sand-stone, in my opinion, it is better to adopt a sbc of maximum 50 tonnes/sq m.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the effect of duration of earth quake on framed structures ?
Explain creep?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
What are the different types of civil engineering?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
how to design and calculate materail quantity for concrete speedbreaker ?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
How much 1 cum of M15, M20 & M25 concrete weigh?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is meant by solid geometry?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience