Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the bearing capacity of hard rock

Answer Posted / j c gogoi

In india maximum permissible loads (sbc) shall not exceeds 3 mpa. Further, rqd and joint spacing has a vital role in s b c estimation. A lone piece of rock may sometime shows higher ucs which may lead to misunderstanding of behaviors. In addition to this, our indian codes suggested to consider soft and jointed rock mass as soil deposit. In the stated case of sand-stone, in my opinion, it is better to adopt a sbc of maximum 50 tonnes/sq m.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

5108


Explain soil analysis?

1124


Explain what is Critical Path Method (C.P.M)?

1114


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

1086


What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.

2407


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

2326


What is difference between combin footing & rapt footing

1795


is basic cost of the material includes tax?

2041


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

2193


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

2474


qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

2203


what is right & short method of measurement of slab&beam

2015


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2223


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

2053


 Describe a time when you anticipated potential problems and developed Preventive measures

3261