What do you do as a Engineering person EPC for
Sizing&Selecting Control Valve?
Answer Posted / jigaranadkat
Prepare AVL (Approved vendor list)
You need provide basic design data which includes but not limited to Temp., Pressure, Min., Max and no0rmal operating flow. Other requirement viz., Hand-wheel requirement, Max. opening time, limit switches SOV, available air pressure @ site, Noise requirement (< 85 dB) leakage class, You need spring return actuator or double acting ? what is the service (corrosive, Slurry, Liquid, Gas ) positioner requirement , booster etc. etc. and primary calculated CV.
Perform offer / bid evaluation.
Vendor meeting if required.
Provide inspection schedule , Delivery schedule. Preform factory inspection and sometimes site installation (based on company requirement) and inspection.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
while i check zero check for dp flow transmitter some fluctuating came (0 to 458 kg/h) what is the reason?
Exothermic reaction./ endothermic reaction
what is cold loop? difference between hot and cold loop?
what is vibration a part of proceess variable? if vibration is a part variables then how we minimize the actual vibration on machine on load,? vision of instrumentation contrl plz ans me IPGDL interview question
Why rdt and thermocouple both give different output .and one things more, how to generate ohm or mili volt plz mail me merajalam143545@yahoo.com
where proximity sensor installed on tank in loading arm application
POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?
can anyone can let me know in Eurotron Micro cal 2+ calibrator in milli amps source mode we are not able to get 20 milli amps output it only produces 1.52 milli amps out, but display shows increase in milli amps , and err6 displays, let me know how to remove the err 6.
Why plc require in analog input 4-20amp & 0-10 volt?
Explain operation of Haskel pump.
please someone tell me what is function of vibration sencer and how many types and how to control viberation.please. my id is jimmykhan077@gmail.com
Which type of pressure can be measured by primary elements?
all types instrumentation questions want
Tr. Wiring for calibration.
key exchanges in wpa,wpa2,tls