1. Brick work in cement mortar in foundation and plinth 1.25cum (45cuft)per mason/day, or 600 Bricks/day minimum.

2. 12mm (1/2) plastering with cement mortar 8.00sqm (80sqft)per mason/day.

3. Supplying, fitting, fixing and removing shuttering & staging 7sqm/carpentar/day.

Is This Answer Correct ?    77 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1772


How to make tiles floor step by step procedure?

1491


Differentiate orthographic and isometric projections?

644


List out the types of roofs?

673


i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need

2062






Which is the most prominent tower of world?

632


Why should you show Client/Engineer activities clearly on the project plan?

1957


where can i get the previous question papers for rrb section enginerr (civil)

1868


How do we determine the specific gravity of a cement?

653


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

1811


Would you cause a 55-gallon drum of water to weigh more by climbing in?

678


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1098


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

948


In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

3713


How to increase a bearing capacity of soil?

657