Answer Posted / yogesh dabhole
Thermal power plant
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
what is the Asfalt test?in road constraction..?
What will be weight of 0.5mm GI sheet per sq.ft?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Which stone is best for wall construction Laterite Stone or Cement Blocks
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
What is the purpose of the gap in the road on this bridge?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
cement and sand required for one block of size 0.23*0.15*0.46
How do you change a dimension value in solidsworks?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what is the most suitable foundation when construct a bird watching tower in a marshy land
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed