Whta is the proportion of M30

Answer Posted / yogesh dabhole

1:0.75:1.5

Is This Answer Correct ?    0 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

1601


what is grade intersection?

1594


Who built the sears tower?

627


Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?

1423


Sir how to find cutting length for footing steel bars in the shape of "u"

1315






What is semirigid connections?

1626


1:4:8 pcc calculation 591 cu.ft

1795


PL.tell me about civil engineering questions with answer

2107


Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?

3014


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1937


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

1619


What is the difference between engineering stress and true stress?

643


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1638


What are some facts about concrete?

653


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1595