what is difference between sub-station and switch yard.
Answer Posted / dayanand n ayatti
Switch yard means switching of power generated from power plant to substation maintaining same voltage level where substation is used to step up or step down the power as per requirements
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
why various test are performed on electrical panels & power cables before commissioning on site & what are these test???
LT cable fault chaecking equipment and to find out the distance at what distence it failure . Name and where it is available?
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
what is the VA(Volt-amphere)? define with calculation?
hi friends if you have any 400KV Substation Erection and installations Drgs please send to me.My email id:kandi.suresh441@gmail.com
describe the phenomena of vacuum interruption in C.B
is IS says that neutral should be brought to switch box. and this one is a recomended practice
how many joints are allowed in underground HT cable of 1 KM
could an induction motor be used for regenerative braking in electric-train control? in this type of application would some scheme have to be devised to obtain low synchronous speeds while braking? would induction-motor drive, therefore, be suitable for passenger service?
How relay coordination has to be done? what are the inputs are required for this? Please explain this with calculation method?
why do we put a transformer on soak before loading it
How to apply 'c' license and also explain what is difference between 'c' and 'b'license.i am also working in one of the private company.i have finished my diploma in 2014 .i have already finished in ITI electrician course.....
what is the difference between vector scale and vector diagram?
When lag/lead/lag-lead compensation is employed?
what is the effect of vector group while phase sequence of a generator changes,whether the vector group changes or not