How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / abdurrahman
Dimention of brick=215mmx102.5mmx65mm
total volume=0.230*0.115*0.075=0.00198cum
calculate the no. of brick in 1cum= 1cum/.00198cum=505 brick
(2)calculate the cement
total dry mortar required in 1cum=0.30cum
cement required 1+5=6 0.30/6=0.05cum
cement in kg 0.05*1440=72kg
sand required=0.30*5/6=.25cum
sand required=0.25*1520=380kg
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
how to create our resume?
What is the minimum size of the particles of silt soil?
what is the percentage of silt in black cotton soil.?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
how to calculate the strength of rebound hammer test reading in building construction ?
Permissible wastage of cement as per IS code ? In which IS code I get it?
What are the techniques to measure road difference?
Why are pull-out tests performed for soil nails?
What is portland cement
pls give me some basic informations in construction of a structure?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
on what basis the partial factor of safety are decided? form the load combinations
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..