How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / abdurrahman
Dimention of brick=215mmx102.5mmx65mm
total volume=0.230*0.115*0.075=0.00198cum
calculate the no. of brick in 1cum= 1cum/.00198cum=505 brick
(2)calculate the cement
total dry mortar required in 1cum=0.30cum
cement required 1+5=6 0.30/6=0.05cum
cement in kg 0.05*1440=72kg
sand required=0.30*5/6=.25cum
sand required=0.25*1520=380kg
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the release of lien?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
how to determine H- zone in a column? where it will occur?
Define polar co ordinates.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Questions related to civil.engg in company
why is M30 grade Concrete use for Foothing & Column M50
what are the values of compressieve strenght?
construction workers how much time take one work or qty
how to calculate number of bitumen for road asphalt
what is moment-curvature relationship in semi rigid connections??
How to calculate plastering for elevated water storage tank
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8