how to calculate the number of cement bags required for 1m3
of work
Answer Posted / sumair jain
Grade Quantity(bags)
M5 2.83
M7.5 3.48
M10 4.52
M15 6.45
M20 8.22
M25 11.304
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Describe a time when you anticipated potential problems and developed Preventive measures
Explain the mechanism of cavitations in pipes and drains?
Formula for calculating the volume of bulb in underreamed pile
what is the 0 value in quantity surveying
What is the difference between chamfer and fillet?
significance of specific surface area of particles?
What is need for setting limits?
Types of column foundation and how to calculate its steel quantity.
Whats the meanig of ,'K' VALUE in the case of soil.....
How to calculate Volume of Wet cement concrete for a specific grade?
how to shuttering is used in slab
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks